All copper electrical wire rope hoist cd1 superior quality type of crane hoist 0.5t6m

All copper electrical wire rope hoist cd1 superior quality type of crane hoist 0.5t6m

Product description:

product description:

CD1 wire rope hoist is a small light lifting equipment, which can be installed in single-beam crane, bridge crane, the gantry cranes, jib cranes and other cranes, a little change, you can also do windlass. CD1 electric hoist lifting normal speed, to meet the requirements of the general situation, it is one of the commonly used lifting equipment in factories, mines, ports, warehouses, garages, shops, etc., is to improve labor efficiency, improve working conditions Lifting essential.


Product light small, compact structure, different specifications, stable operation, simple operation, easy to use. You can do straight on the same plane, bent on circulating overhead track used either in the I-beam to the track electric single-beam, using a manual single-beam, bridge, suspension, cantilever, gantry cranes. CD1 electric hoist widely used in factories, warehouses, docks, power plant, sawmill and other occasions, the lifting transporting goods, the best lifting equipment.


Demolition after a new installation or after installation of electric hoist inspection, it should first be empty commissioning times. But before installation is complete, should not turn the power test. In use, the absolute prohibition in impermissible environment, and exceed the rated load and the number of shots per hour at rated (120) case. When installation and maintenance, must be strictly limiting device is flexible and reliable inspection, when the limit was raised to the position of the hook, hook it to the shell casing from the reel must greater than 50mm (10t, 16t, 20t must be greater than 120mm). When the hook is lowered to the limit position, it should ensure that the reel ring rope safe, effective and safe rings must be not allowed more than two laps pressed simultaneously in both the electric Hoist the opposite direction of movement of the flashlight shutter button.


1, electric hoist crane unloading heavy flanking shall prohibit overload.

2, during use, the operator should always check whether there is chaos buckle rope, tie a knot, out of the groove, wear and so on, if there should be immediately removed, and should always check the guide rope and limit switches are safe and reliable.