High Lumens SMD T10 LED Tube with AC85-265V Input

High Lumens SMD T10 LED Tube with AC85-265V Input

Product description:

Quick Details

  • Light Source: LED
  • Item Type: Tube Lights
  • Lamp Body Material: Aluminum
  • Certification: CE, FCC, RoHS
  • Place of Origin: Guangdong, China (Mainland)
  • Brand Name: KINGJO
  • Color: Transparent
  • Certified: CE, FCC, RoHS
  • Model Number: KJ-TLC12T, T10
  • Light: stable
  • Lamp Holder: Other
  • Lamp Holder/ Base: Other
  • Correlated Color Temperature: 2800-3300K 3800-4300K 5800-6500K
  • Material: Aluminum Tube+PC Cover
  • Input Voltage: AC85-265V
  • Shape: Column

Packaging & Delivery

Packaging Details: 50 pcs/ carton G.W.: 38Kgs N.W.: 32Kgs Size: 133*50*30*cm.
Delivery Detail: 7-20days after order confirmed. Depends on order Qty.


17W SMD T10 LED Tube
1) CE, RoHS, FCC certified
2) 3-year warranty
3) High power, energy saving.
4) Taiwan Chip: Epistar

High Lumens SMD T10 LED Tube with AC85-265V Input

Tube material: Aluminum tube

Humidity: (95%

Power: 17W

CRI: ) 75Ra (white)

LED quantity: 288pcs (SMD led)

CRI: ) 80Ra (warm White)

Led efficiency: 110 lumen/ W

Power factor: ≥0.95

Input Voltage: AC85-265V

Equal to: 36W CFL

Dimension: L1213mm*D30mm

Typical Lumen: 1500Lm (White Color)

1M/ 2M/ 3M/ 4M (Lux) : 255/125/55/40

Environment Temp: -20 ~ +40°C

Work frequency: 50-60Hz

Color Temp: 2800-3300K 3800-4300K 5800-6500K

view angle: 120°

Product Description:

1. T10 LED Tube 17w Equal to 36w fluorescent tube.

2. Well-Designed .

3. High brightness import LED chip from Taiwan.

4. Energy-saving. Saving more than 50% power than the traditional fluorescent tube.

5. Long lifespan ≥50000Hrs. Prolonging the life time by using the die-casting aluminium

6. Easy to install

7. Excellent thermal design

8. No flickering

9. No mercury, No ultraviolet/ infrared radiation or the other harmful substances.

10. Widely used in Hotels/ Bars/ Conference / Meeting rooms/ Offices


N.W.: 38kgs G.W.: 32Kgs

50 pcs/ carton Size: 133*50*30cm

Shipping term / Delivery port: EXW works Shenzhen or FOB Shenzhen
Payment Term: By T/ T, L/ C or negociated
Production leadtime: 7-20DAYS
Sample leadtime: 3 -7 DAYS


1, MOQ: 100pcs

3, Price Term: When single order volume reaches USD: 10000. the above price change to FOB shenzhen price.

4, Delivery time: samples 3-7days, bulk order: 7-20days after order confirmed. Depends on order Qty.

5, As the exchange rate of USD has fluctuated constantly, above price is not final offer, please confirm before place an order.

About Us

Shenzhen KingJo Opto Co. , Limited. has focused on high-performance LED lighting components and lighting applications R & D and manufacture. The products include LED fluorescent tube, LED bulb and LED spotlight, and indoor lighting series. Through constant innovation , we have accumulated a number of our own core technology, successfully applied for some invention and utility model patents, therefore has been a product leader in the field of indoor lighting products of LED industry

There are high standards and anti-dust workshop, welding and domestic top LED lamp assembly equipments, production and testing equipments investment of one millions. LED fluorescent tube production output reaches 500, 000pcs per year, light bulb products output more than 300000pcs per year. Raw materials used in products mainly from Japan, the United States, Germany and Taiwan. We have UL, CE, ROHS certification, lighting applications products are being exported to Europe, the United States, Japan, Korea, Middle East and Southeast Asia more than 50 countries. Quality control system operating in strictly accordance with ISO9000 requirements. We pursue products with zero defects, zero-distance service, customer satisfaction as our goal, persist in technology innovation and development

Nowadays, our LED tube series used in Government project, hotel, school , hospital , supermarket and many other public places by our customers, the products are being enjoyed high reputation from clients as excellent performance, stable quality and best after service.

The Reception Hall of KINGJO

The Building of Factory