T10 Led Tube Light 9W Replacing 20W Fluorescent tube

T10 Led Tube Light 9W Replacing 20W Fluorescent tube

Product description:

Quick Details

  • Light Source: LED
  • Item Type: Tube Lights
  • LED Light Source: 3528
  • Warranty (Years) : 2
  • Input Voltage (V) : AC85-265
  • Lamp Power (W) : 18
  • Lamp Luminous Flux (lm) : 1714-1815
  • Lamp Luminous Efficiency (lm/ w) : 85
  • CRI (Ra) ) : 70
  • Color Temperature (CCT) : 2800-7500K
  • Working Temperature (℃) : -20 - 50
  • Working Lifetime (Hour) : 50000
  • Lamp Body Material: Aluminum
  • IP Rating: IP54
  • Certification: CE, EMC, FCC, RoHS
  • Place of Origin: Guangdong, China (Mainland)
  • Brand Name: KINGJO
  • Model Number: T10
  • Materials: : Aluminum Tube+PC Cover
  • Working Humidity: : ( 95%
  • LED Qty: : 144pcs
  • Light Source: : 3528 Bridgelux chip
  • Beam angle: : 120°
  • Dimension: : 32*600mm
  • N/ W: 261g
  • Inner package: : 40*40*620mm
  • Carton: : 635*420*430mm, 100pcs/ CTN
  • Replacing: : 20W fluorescent tube

Packaging & Delivery

Packaging Details: Inner package: 40*40*620mm Carton: 635*420*430mm, 100pcs/ CTN professional export package.
Delivery Detail: 3-7 days for small quantity, 8-15 days for large quantity


T10 Led Tube Light
1. replacing 36W Fluorescent tube
2. Bridgelux chip

T10 Led Tube Light 9W Replacing 20W Fluorescent tube

As a professional manufacturer of T10 LED Tube, we have many kinds of LED Tube lights for choosing, Tube light is designed to work with conventional fluorescent fixtures. To replace the short lived fluorescent lamps that are typically used in interior lighting, T10 LED Tube can be used to retrofit existing fluorescent installations in all types of applications.

T10 Led Tube Light Feathers:

1. High color uniformity, low power consumption, low depreciation, long lifetime, high luminance.

2. Use RoHS compliance 6063 aluminum, fully solve the led heat transport problem, so that the lamp can keep in top working condition;

3. High-precision constant current drive, which can extend the led lifespan ;

4. The material of lampshade is PC to ensure the best light transmission;

5. 50% energy-saving over fluorescent tube.

Packing & Delivery:

Packing detail: Blister bag/ white box/ master carton

Delivery detail: 4-7 days for samples, 7-15 days for mass production

Our Competitive Services:

1. OEM&ODM are available for us

2. can design and produce according to your requirements

3. protect all your private information

4. SMALL orders are avaliable

5. Our experianceed professional at you free service if needed

6. Prompt and safe delivery