ZRN-LDC electromagnetic flowmeter installation

ZRN-LDC electromagnetic flowmeter installation
 

Product description:

The company electromagnetic flowmeter calibration device



Electromagnetic Flowmeter Installation site (DN32mm)
After passing the meter electromagnetic flowmeter selection and purchase of the meter next step is how to install electromagnetic flowmeters, Beijing Sino-Swiss can Instrument Technology Co., Ltd. constantly improve the standard flow meter installed at the same time, the production of its own over the years . meter manufacturing experience, a summary of the following installation experience, how in the pipe installation:
Should be installed in horizontal and vertical piping at lower upwardly, avoid installation at the highest point of the pipeline and vertically downward;
It should be installed on the pipe at the rise;
In opening the discharge pipe installation and should be installed at the lower pipe;
If the pipeline gap exceeds 5m, the sensor is installed downstream of the exhaust valve;
The sensor should be installed downstream of the control valve and shut-off valve, and should not be installed upstream of the sensor;
Import and export of the sensor must not be installed in the pump should be installed at the outlet of the pump;
In measuring wells installed flowmeter way
1, the inlet
2, the overflow pipe
3, entrance gate
4, the cleaning hole
5, Electromagnetic Flowmeter
6, short tube
7, exit
8, the discharge valve
How to choose to install Node:
Correct choice and correct installation mounting points are electromagnetic flowmeters are a very important part, if the installation link failure, the light affect the measurement accuracy, severe cases can affect the life of the meter, or even damage the meter.
When choosing the installation location require special attention:
Non-measurement axis electrodes must be approximately horizontal direction;

· Must be completely filled with liquid measuring pipeline;