Manufacturers supply the income side of the multilayer solar panels (easy to install, adjustable thickness)

Manufacturers supply the income side of the multilayer solar panels (easy to install, adjustable thickness)

Product description:

Material: Aluminum Number of floors: snap type income side Origin: Foshan
Grade: A Level Specification: 6m / sets Open: Manual
Brands: Conrad Color: silver

Shunde, Foshan City into a giant specializing in the production of decorative materials wholesale solar panels aluminum batten / aluminum closing edge lighting system and solar panels professional construction and installation accessories (SLIONTEC 5931/5932 butyl waterproof tape, EPDM seal waterproof tape / PC board greenhouse accessories, etc.) Sunshine aluminum plate is mainly used for the income side of the sealing edge at both ends of the plate, can effectively prevent dust, insects, rain and other impurities into the Sunshine plate hollow structure and solar panels shed light appearance after installation. And we which snap-type production to provide income side is suitable for 4mm ~ 16mm sun panels and polycarbonate panels, you can insert the corresponding keyhole according to the sheet thickness! We received supporting the supply side of the groove desired water leak EPDM (triple B c) strips, can effectively leak-proof water, sun panels, polycarbonate panels without any corrosive, anti-aging.

Welcome to the new and old customers and friends to inquire negotiate business, we will do our best to provide you the most suitable products!

Other models of various types of income side: both for double PC sun panels, another for the income side of the multi-layer sunshine board

Income side (also called Edge, cuffs, etc.) is mainly used for solar panels at both ends sealed against dust, rain, insects into the plate hole, the impact plate life and appearance.

Material: 6063

Specification: 6m / support

4mm ~ 6mm small income side

8mm ~ 10mm large income side

12mm ~ 20mm three board income side

Installation Notes and sun panels Installation recommendations:

Must ensure that the skeleton formation and cleaning 1. Before installation;

2. The first check the size of the plate and cut the amount of expansion reserve eligibility; pay special attention to leave enough uniform expansion gap; calculated as follows: Total expansion gap = expansion coefficient * maximum temperature difference before and after the local installation * sheet length

3. The thermal expansion coefficient of the plate and the support frame are different and need to stay in margin to withstand wind pressure, snow load, etc., so embedded in the amount to be set aside adequate, and thermal expansion and contraction of space. Usually the sheet edge extends into the cage 25mm or more, and at least two of ribs when installing fixed area; thermal expansion and contraction of 3mm per meter gap in general ;

4. identify UV plate surface side; and to the side out installation; never allow the inward side of the UV installation;

5. When installing the sheet; protective film on the cover sheet of the joint compound will affect the binding and plate; so before installing the protective membrane around the lift plate 5 ~ 10cm; do not let the profile clamp protective film; but it can not lift too much; so as to avoid damage to the plate surface operations;
Note: Some workers when operating in the protective film sandwiched in profile; then draw lifted with a sharp tool and then printed; but often scratch the plate surface and cause damage to the plate;

6. Under cold-formed hollow plate installed, the bending radius of not less than 175 times the sheet thickness;

7. hollow sheet only along the direction of the curved ribs;

8. hollow plate tilt should be installed along the direction of the ribs, it is conducive to the export of condensate;

9. shall be fixed directly self drilling screw on the board; shall reaming; all drilling diameter should be larger than the bolt diameter; leaving expansion and contraction gap; therefore when the material plate openings; aperture should be larger than the screw diameter 50%; avoid locking screws in the curved portion; avoid cracking plate;

10. The self-tapping screws firmly tightened evenly to ensure genuine compaction profile sealing strip and plate;

11. All pores should be filled in neutral sealant and neutral sealant adhesive coating the exposed parts to prevent the infiltration of detergent edge, to prevent delay onset of crack; when found defective installation, site of leakage may occur in may be sealant compensate. Selection to choose the cured sealant remains soft, low modulus, elongation greater than 50% neutral weathering silicone rubber, before sizing must make aluminum and sheet surfaces clean and dry , so that no oil, dust, water vapor, dew and other debris, sizing should be uniform, smooth surface layer, and can not be uniform cross-section dimensions intermittent phenomenon; pay special attention to the neutral sealant used must advance Compatibility test sheet to avoid chemical reaction with the plate;

12. The center hole to the plate edge spacing should be greater than or equal 5cm ;

13. The whole process is strictly prohibited plate installation foot pedal surface, shall be used across the plate Moveable pedal operation;

14. PC board cut length must be greater than the width before bending;

15. Plate immediately after installation requirements torn off the protective film; as a result of the special requirements of the protection board construction; also must first torn off protective film; and then re-cover;

16. After installing the plate should be a self-test; in particular, should seriously do spray test; check for leaks; if leakage hazard should be eliminated; then check the appearance of quality;