Spline shaft | rake bucket rock loader accessories

Spline shaft | rake bucket rock loader accessories

Product description:

Spline shaft rake bucket rock loader accessories

Pinion gear 33 of the planetary gear 29 gear 22 of the planetary gear 23 64 34 gear internal gear 80 gear 54 gear shaft 20, gear 53 spline shaft planetary carrier rake harrow drum brakes with an oil seal O-ring into the chute intermediate groove connecting groove relief groove head wheel, guide wheel man sheave sheave small tail wheel pin 35 pin 25 auxiliary brake motor operating mechanism curved panels cover empty drive roller assembly left and right gland gland right cover left cover card rail brake around the auger gearbox assembly bearing housing spacer spacer minor axis steering wheel hard wedge guide handle soft wedge baffle shaft gear brake band brake drum cartridge holder with brace

Rock rock complete function, to dangerous rock, chisel top, trimming, trenching and other operations, which aggregates push plate mechanism enabling the aggregate more focused, more convenient loading Pa. It is not only up the hill at 30 ° or less , down the tunnel rock, you can also parallel operations tunneling process.
Rock loader can be used in underground tunneling and mining useful minerals in place, as well as the mineral loaded carts. At the same time it can also be used to ground the load loose materials. Its applicable to mines, railway tunnels, culverts and other hydraulic department.
Rock loader sealed lubricated track, walking track shoe unit, pin sets and other sports Deputy Commissioner were confirmed by quenching, long life, wear-resistant, easy to adjust the tension caterpillar whose Bucket lip made of special materials, high strength, wear resistance, long service life.

Former rock loader operation should be prepared

1 , Rake bucket watering and flushing Bangding must work on the waste rock before the rock or coal pile.
, Knocked and asked to help the top, clean living environment Bangding remove refuse.
, Install good fixed wedge, tail wheel hung in the rock above the heap Face 800-1000mm , Hit wedge eye; eye fixed number depending on the width of the roadway; eyes away 1m Left and right, deep eyes should be longer than wedge 50-100mm , To the lower belt 5°-10° Dip after wedge eyes lay the coal pneumatic drill or evacuation drill pipe and feng shui to Face. First wedge placed in the eye, and then insert the wedge tight, then tighten with hammer. First tail wheel hanging within the central wedge ring, ready to rake rock loader heap Central rocks.
Check rail fastening reliable driver from the operating side of the tunnel wall not less than 700mm .
Check the lubrication oil parts are appropriate, no leakage, electrical equipment when watering should be properly covered in the ceiling.
6, check the guide wheels, tail wheel suspension is correct and secure. Pulley rotating flexible, rope wear, broken wires exceeds a predetermined, neatly arranged on the drum, brake band between elastic appropriate.

Sales Manager: Hou Guijuan

Hotline: 0537-3151358

Mobile: 15376502873

QQ: 1684599823

Want: yimei018

MSN E-mail:. Yimeijixiehou @ 163 com

Company Address: Electromechanical South Road, High-tech Zone, Jining City,

Choose one hundred million coal! Credit is guaranteed! Quality assurance! Service is guaranteed!